{"id":32515,"date":"2025-07-10T16:10:34","date_gmt":"2025-07-10T15:10:34","guid":{"rendered":"https:\/\/www.buildingsmart.org\/ifc-5-core-project-plan-is-now-out-for-review-by-the-standards-committee\/"},"modified":"2025-07-11T09:30:24","modified_gmt":"2025-07-11T08:30:24","slug":"ifc-5-core-project-plan-is-now-out-for-review-by-the-standards-committee","status":"publish","type":"post","link":"https:\/\/www.buildingsmart.org\/ifc-5-core-project-plan-is-now-out-for-review-by-the-standards-committee\/","title":{"rendered":"IFC 5 Core Project Plan is now out for review by the Standards Committee."},"content":{"rendered":"\n\n\t<b>Vote closing date: 08 Aug 2025<\/b><br \/>\n<b>Report: <a href=\"https:\/\/app.box.com\/file\/1919114740011?s=w9xsl0rdtbe35uyho9k7y1extfh5k7gc\" target=\"_blank\" rel=\"noopener\">Link<\/a><\/b>\n<p>&nbsp;<\/p>\nThe IFC 5 Core Project Plan is now out for review by the Standards Committee. The vote closes on 8th August 2025.<br \/>\nPlease follow this <a href=\"https:\/\/app.box.com\/file\/1919114740011?s=w9xsl0rdtbe35uyho9k7y1extfh5k7gc\" target=\"_blank\" rel=\"noopener\">link<\/a> to view the Draft Project Plan. If you have any comments or feedback, please make this available to your Standards Committee representative.\n<p>The IFC 5 Core project establishes the foundation of a new, modular version of the Industry Foundation Classes (IFC) standard. Unlike previous monolithic releases, IFC 5 introduces a clearly separated Core module that defines essential, domain-neutral concepts-such as object identity, spatial structure, referencing, and extensibility. This project is jointly developed by buildingSMART International and ISO\/TC 59\/SC 13 JWG 12.<\/p>\n<p>The IFC standard is evolving into a modular structure with IFC 5, aiming for better scalability and alignment with digital workflows. This project develops the IFC 5 Core, defining essential concepts for future domain-specific extensions. Work is closely coordinated with ISO, under ISO\/TC 59\/SC 13 JWG 12, and will result in a new part of the ISO 16739 series. The IFC 5 Core ensures a stable foundation without replacing existing IFC 4.x parts.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Vote closing date: 08 Aug 2025 Report: Link &nbsp; The IFC 5 Core Project Plan is now out for review by the Standards Committee. The vote closes on 8th August&hellip;<\/p>\n","protected":false},"author":31,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[53],"tags":[133],"class_list":["post-32515","post","type-post","status-publish","format-standard","hentry","category-all-rooms","tag-consultation"],"wpsp_post_type":null,"_links":{"self":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts\/32515","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/comments?post=32515"}],"version-history":[{"count":0,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts\/32515\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/media?parent=32515"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/categories?post=32515"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/tags?post=32515"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}