{"id":29512,"date":"2024-03-19T17:00:16","date_gmt":"2024-03-19T17:00:16","guid":{"rendered":"https:\/\/www.buildingsmart.org\/the-use-case-2-06-collision-check-mechanical-integration-of-medium-voltage-distribution-systems-in-a-building-activity-proposal-has-been-reviewed-and-has-been-endorsed-by-the-sta\/"},"modified":"2024-03-19T17:00:16","modified_gmt":"2024-03-19T17:00:16","slug":"the-use-case-2-06-collision-check-mechanical-integration-of-medium-voltage-distribution-systems-in-a-building-activity-proposal-has-been-reviewed-and-has-been-endorsed-by-the-sta","status":"publish","type":"post","link":"https:\/\/www.buildingsmart.org\/the-use-case-2-06-collision-check-mechanical-integration-of-medium-voltage-distribution-systems-in-a-building-activity-proposal-has-been-reviewed-and-has-been-endorsed-by-the-sta\/","title":{"rendered":"The \u201cUse case 2.06 &#8211; Collision check &#038; mechanical integration of medium voltage distribution systems in a building\u201d Activity Proposal has been reviewed and has been endorsed by the Standards Committee."},"content":{"rendered":"<p><b>Report: <a href=\"https:\/\/app.box.com\/s\/svc7i95l0lb5gy3nbaerh8f35tgrw4rb\" target=\"_blank\" rel=\"noopener\">Link<\/a><\/b><br \/><b>Outcome report: <a href=\"https:\/\/app.box.com\/s\/7zjfe5z6nl2ecplc035rsg7zfep09lla\" target=\"_blank\" rel=\"noopener\">Link<\/a><\/b><\/p>\n<p>The openBIM for Electrical Engineering Activity Proposal has been reviewed and endorsed by the Standards Committee.<br \/>\n<br \/>The Standards Committee feedback and results can be viewed using the Outcome report link.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Report: LinkOutcome report: Link The openBIM for Electrical Engineering Activity Proposal has been reviewed and endorsed by the Standards Committee. The Standards Committee feedback and results can be viewed using&hellip;<\/p>\n","protected":false},"author":31,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[86],"tags":[133],"class_list":["post-29512","post","type-post","status-publish","format-standard","hentry","category-electrical","tag-consultation"],"wpsp_post_type":null,"_links":{"self":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts\/29512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/users\/31"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/comments?post=29512"}],"version-history":[{"count":0,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts\/29512\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/media?parent=29512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/categories?post=29512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/tags?post=29512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}