{"id":21485,"date":"2019-06-03T12:30:42","date_gmt":"2019-06-03T11:30:42","guid":{"rendered":"https:\/\/www.buildingsmart.org\/?p=21485"},"modified":"2021-04-05T16:14:29","modified_gmt":"2021-04-05T15:14:29","slug":"bim-competency-assessment","status":"publish","type":"post","link":"https:\/\/www.buildingsmart.org\/bim-competency-assessment\/","title":{"rendered":"BIM-Competency Assessment"},"content":{"rendered":"\r\n<p>In this latest blog, Mark Baldwin, Professional Certification leader and Board member of buildingSMART Switzerland provides step-by-step instructions on how organisations can measure their BIM maturity.<\/p>\r\n<p>Organisations measure their BIM competency to plan their implementation and to track progress. There are many methods to do this, most of these are self-assessment based. The BIM-Profiler is a free application developed by BIMconnect to helps organization assess their current and target BIM compency. It is based on the Organisational BIM Assessment method developed by Penn State University.<\/p>\r\n<p>With the BIM-Profiler you can assess the BIM fitness of your organisation in 3 easy steps.<\/p>\r\n<p>Defining your organisation type, size and the number of years that the organisation has been working with BIM.<\/p>\r\n<p>Here you can rate both your current and target position by responding in six sections<\/p>\r\n<ul>\r\n<li>Strategy;<\/li>\r\n<li>BIM-Uses;<\/li>\r\n<li>Process;<\/li>\r\n<li>Data structure;<\/li>\r\n<li>Infrastructure, and<\/li>\r\n<li>Personnel<\/li>\r\n<\/ul>\r\n<p>Once you have addressed all six sections you can submit your assessment to calculate your results. Your organisation&#8217;s BIM-Readiness will be shown as an overall score, with the individual competency areas presented in a spider matrix.<\/p>\r\n<p><img loading=\"lazy\" decoding=\"async\" title=\"BIm Assessment 1\" src=\"https:\/\/www.buildingsmart.org\/wp-content\/uploads\/2021\/03\/BIm-Assessment-1.jpeg\" alt=\"BIm Assessment 1\" width=\"297\" height=\"212\" \/> <img loading=\"lazy\" decoding=\"async\" title=\"BIm Assessment 2\" src=\"https:\/\/www.buildingsmart.org\/wp-content\/uploads\/2021\/03\/BIm-Assessment-2.jpeg\" alt=\"BIm Assessment 2\" width=\"197\" height=\"210\" \/><\/p>\r\n<p>Author: Mark Baldwin.<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>In this latest blog, Mark Baldwin, Professional Certification leader and Board member of buildingSMART Switzerland provides step-by-step instructions on how organisations can measure their BIM maturity. Organisations measure their BIM&hellip;<\/p>\n","protected":false},"author":16,"featured_media":21490,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[28],"tags":[],"class_list":["post-21485","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"wpsp_post_type":null,"_links":{"self":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts\/21485","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/comments?post=21485"}],"version-history":[{"count":0,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/posts\/21485\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/media\/21490"}],"wp:attachment":[{"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/media?parent=21485"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/categories?post=21485"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildingsmart.org\/wp-json\/wp\/v2\/tags?post=21485"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}